Quickstart
On this page
This guide takes you from an empty tenant to a complete, traced cable: a switch and a patch panel in a rack, a floor box in an office, and a PC plugged in. Do the steps in order; each takes a minute.
Good to know
Just want to look around first? An administrator can load a fully cabled example with Load demo tenant under Administration → Tenants. You can delete it afterwards.
1. Choose the tenant#
Sign in (see Signing in) and pick the tenant you want to work in with the Tenant picker at the top. A tenant is one customer, or your own organisation. No tenant yet? An administrator creates one under Administration → Tenants with New tenant.
2. Create a site#
- On the dashboard, click New site.
- Fill in ID
HQand NameHeadquarters, and click Create site.
The ID is short on purpose: it becomes the start of every path, such as HQ/00/SL/RK001. See IDs and paths.
3. Add a floor#
On the site page, click New floor, fill in ID 00 and Name Ground floor, and click Create floor.
4. Add a server room and an office#
- On the site page, click Room in the block of floor 00.
- Create the server room: ID
SL, NameServer room. - Click Room once more and create the office: ID
LA, NameOffice area.
5. Add a rack#
Open the server room and click New rack. Fill in ID RK001, Name Main rack and Height (U) 42, and click Create rack.
6. Fill the rack#
Click the rack to open it in the rack editor.
- In the Devices panel on the left, choose Generic in the list of manufacturers.
- Drag Patch Panel 24x RJ45 Cat6 onto the top rack unit.
- Drag Switch 24x GbE + 4x SFP+ onto the unit below it.
Each device gets an ID straight away (such as PP01 and SW01), and the cursor jumps to its Name field, so you can type a name. Everything is saved as you go.

7. Add a floor box in the office#
Open the office (room LA) and click Add device. Choose the Template Floor Box 2x RJ45, leave ID empty for an automatic one, and click Add device.
8. Cable the floor box to the patch panel#
This is the permanent cabling in the building: from the rear of the patch panel to the floor box.
- Go back to the rack editor and click the patch panel.
- In the inspector, choose Tools → Manage building connections.
- Set Number of connections to
2and choose the Target roomLA. The floor box is ticked under Target devices. - Check the Preview and click Create connections.
9. Patch the panel to the switch#
In the rack editor, click port 01 of the patch panel and then port 01 of the switch. A patch cable appears between them, in its colour. To connect a whole range at once, use Tools → Bulk connect… (see Bulk connect).
10. Connect a PC and trace the cable#
- In the office, click Add device, choose the Template Workstation and click Add device.
- On the device page of the PC, click its port and then Connect cable. Choose the floor box, then port 01, and click Connect.
- Click Trace on the same port.
The trace shows the whole path: from the PC, through the floor box and the patch panel, to the switch. See Tracing a cable end to end.

Next steps#
- Put the drawing of the floor in RackTrace and place the rack and the floor box on it: Floor plans.
- Print cable labels and a QR sticker for the rack: Labels and QR codes.
- Document the VLANs and give the switch ports a profile: Network plan.
- Invite your colleagues: Users, groups and rights.